Skip to main content

The City of Albany maintains standard specifications and detailed drawings for construction of public facilities. All public improvements are required to conform to these specifications. The Standard Construction Specifications posted here reflect the most recent version of these documents and drawings. It is the user's responsibility to make sure all bids, proposals, plans, and submittals conform to the most recent version at the time the work is bid or approved. The City of Albany assumes no responsibility for contractors and/or engineers that submit plans based on an outdated version of these documents and drawings.

A hard copy of these Standard Construction Specifications can be purchased for $100. Holders of hard copy Standard Construction Specifications will be required to purchase a new copy of specifications each time they are updated.

Current Version: February 2024

Complete document:

Albany Standard Construction Specifications, February 2024

Individual sections:

Index, Engineer's Letter, and Summary of Changes

Divisions

Posting Update History

  • February 2024 (current)
  • June 2023
  • July 2019
  • January 2018
  • July 2015
  • January 2015
  • October 2013
  • January 2012
  • January 2011
  • March 2009
  • March 2008
  • March 2007
  • October 2006 (first online posting)

Drawings

Back to Top