The 2021 Stormwater Master Plan report provides an updated assessment of Albany’s stormwater conveyance infrastructure. It includes a list of capital improvement projects addressing the needs of Albany’s future land use condition, referred to as the build-out condition, with the application of Albany’s flood control detention standards. The primary focus of this master plan is on the conveyance capacity of the existing and build-out stormwater system. The location of deficiencies, recommended capital improvement projects, and associated project costs are provided. Prioritization categories are also provided to assist in future project selection. This report does not address other aspects of the system such as water quality treatment or operations and maintenance (O&M).
- Stormwater Master Plan (1.24MB pdf)
- Appendix A - Deficiencies - Existing and Build Out (8.63MB pdf)
- Appendix B - CIP (6.57MB pdf)
- Appendix C - CIP Detail Sheets (179.75MB pdf)