The Cox Creek Interceptor project will provide capacity to reduce existing overflows and to handle peak buildout flows during a 5-year design storm event. With new additional capacity, surcharging in upstream sewer lines will be significantly reduced with a goal of eliminating unpermitted overflows from the sewer system. Construction of these improvements will also allow for continued property development in the upstream sewer basin and will also facilitate development downstream east of Interstate 5 (I-5).
This project will reduce long-term operations and maintenance costs through reduction in emergency responses and reduction in infiltrating groundwater that must be pumped and treated.
Phase 2
Completed
This project will replace approximately 1,400 feet of undersized pipe with new 24-inch and 30-inch sewer pipe.
Total Cost: $5,200,000
Master Plan: Sanitary Sewer Master Plan
Plan Element: P8
Category: Wastewater
Classification: Interceptors/Collectors
Department: Public Works
Phase 3
Under construction
This project will replace approximately 2,400 feet of undersized pipe with new 24-inch sewer pipe and extend approximately 500 feet of 24-inch sewer pipe across I-5.
Total Cost: $8,367,000
Master Plan: Sanitary Sewer Master Plan
Plan Element: P10A, P10B, P11A
Category: Wastewater
Classification: Interceptors/Collectors
Department: Public Works